Salient features of the proposed TIUNI-PLASU HYDROELECTRIC PROJECT are as under:
Gross catchment area 3320 km2
Maximum design flood for Hydraulic design 7000 cumec
Maximum design flood for Structural design 7810 cumec
Full Reservoir Level 929.50 m
Crest level of Undersluice 909.50 m
No. & width of Undersluice bay 1 no. & 15 m.
Crest level of other bays 911.00 m
No. & width of other bays 7 nos. & 15 m each
Length of Barrage 138.00 m
Type of Intake Side intake on left bank
Design discharge through intake 181 cumec
Crest level of Intake 917.50 m
Underground Desilting chamber 360m x 20m x 21m, 2 no.
Intake Tunnel 6.00 m diameter, 90.50 cumec, 2.035 km. long (2 nos.)
Head Race Tunnel 7.60 m diameter, 145 cumec, 1.850 km. long
Surge Shaft 35.0m dia & 28 m deep
Pressure Shaft/Penstock nos. each 4.0m dia & 110 m long
Type of Power house Surface power house on left bank of river Tons
Type of Turbine Vertical Francis
Maximum Gross Head 67.10 m
Installed capacity 3x24 MW
Annual units generated in 90% Dependable year 293.90 MU
Annual units generated in 50% Dependable year 445.57 MU
Total estimated cost of the project Rs. 979.00 crores
Construction Period 4 years

The scheme would generate 423.29 million kwh in 50% dependable year with 95% plant availability factor. The cost of the project including escalation in cost during construction period and interest on loan amount during construction (IDC) is estimated at Rs. 82953 lakh. The sale price is estimated at Rs. 3.97 per kwh in the first year and the levellised sale price is Rs. 3.55 per kwh.

The Tiuni Plasu Hydroelectric Project (72 MW) on river Tons in district Dehradun is therefore a technically feasible, viable and eligible project for development to meet the energy requirement of the State. The sale price of Rs. 3.55/- per kWh may appear to be on higher side at the first sight. However, considering that energy is becoming scarcer day-by-day, the cost of energy in the long run shall be economical. Hence, construction of 72 MW Tiuni Plasu Hydroelectric Project is worth for consideration.

 

 